• español
    • English
  • Navegar
  • English 
    • español
    • English
  • Login
View Item 
  •   RI UMNG Home
  • 5. Pregrados
  • Facultad de Estudios a Distancia
  • Ingeniería Civil
  • View Item
  •   RI UMNG Home
  • 5. Pregrados
  • Facultad de Estudios a Distancia
  • Ingeniería Civil
  • View Item
 
JavaScript is disabled for your browser. Some features of this site may not work without it.

Estudio de alternativas de manejo de aguas residuales del sector norte, del casco urbano y Montecillo, del municipio de Guatavita

Study of alternative wastewater management in the northern sector, the town and Montecillo, Township Guatavita

Thumbnail
QRCode
Compartir este ítem
View/Open
Trabajo de Grado (1.716Mb)

Citación

       
Date
2014-07-23
Author
Castro Moreno, Henry Alfredo
Obtained degree
Ingeniero Civil
Key words
; alcantarillado – trazado; aguas residuales - control ambiental; purificacion de aguas residuales
Metadata
Show full item record
Documents PDF
Abstract
En el presente trabajo se plantea la comparación de tres tipos de sistema, un filtro Imhoff, la PTAR existente y un Humedal artificial, para escoger una(s) opción(es) que coadyuve, en el tratamiento del agua residual vertida a la quebrada Montecillo del Municipio de Guatavita Cundinamarca. La comparación se hizo, estableciendo la población afectada, los caudales y cargas contaminantes esperadas, las áreas requeridas para implementación, un presupuesto estimado de construcción y mantenimiento, además el reconocimiento de las ventajas y desventajas de cada sistema, para finalmente proponer una solución y generar conclusiones.
In this study comparing three types of system, an Imhoff filter Plant Wastewater Treatment exists and an artificial wetland is proposed, to select one (s) option (s) that contributes, in the treatment of wastewater discharged to the Montecillo broken Township Guatavita Cundinamarca. The comparison was made by establishing the affected population, flows and pollutant loads expected, areas required for implementation, estimated construction and maintenance budget further recognition of the advantages and disadvantages of each system, and finally propose a solution and generate conclusions.
URI
http://hdl.handle.net/10654/12344
Collections
  • Ingeniería Civil [163]

Browse

All of RI UMNGCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

View Usage Statistics
Estadísticas GTMVer Estadísticas GTM

Universidad Militar Nueva Granada

Institución Universitaria - Vigilada MinEducación - Decreto 1075 del 26 de mayo de 2015
Acreditación institucional de alta calidad de la educación superior, por seis años, mediante la resolución 10683 del 16 de julio de 2015
Linea de Atención: +57 (1) 650 0000
Información General: atencionalciudadano@unimilitar.edu.co
Notificaciones Judiciales:juridica@unimilitar.edu.co
NIT: 800.225.340 - 8
Dirección: Carrera 11 # 101 - 80 | Bogotá - Colombia
Sede Campus: Kilómetro 2 vía Cajicá - Zipaquirá
DSpace software copyright © 2002-2016  DuraSpace
Infotegra S.A.S
Contact Us | Send Feedback