• español
    • English
  • Navegar
  • English 
    • español
    • English
  • Login
View Item 
  •   RI UMNG Home
  • 6. Especializaciones
  • Facultad de Estudios a Distancia
  • Alta Gerencia
  • View Item
  •   RI UMNG Home
  • 6. Especializaciones
  • Facultad de Estudios a Distancia
  • Alta Gerencia
  • View Item
 
JavaScript is disabled for your browser. Some features of this site may not work without it.

Toma de decisiones gerenciales para solucionar el déficit de materiales en rellenos de las estructuras de un proyecto hidroeléctrico

Making Managerial Decisions To Solve The Deficit Of Filling Materials During The Construction Of Structures At A Hydroelectric Project

Thumbnail
QRCode
Compartir este ítem
View/Open
Tesis de Grado Especializacion Alta Gerencia (557.6Kb)

Citación

       
Date
2015-05-21
Author
Núñez Torres, Javier
Obtained degree
Especialista en Alta Gerencia
Publisher
Universidad Militar Nueva Granada
Key words
; toma de decisiones; proyectos hidroelectricos - evaluacion
Metadata
Show full item record
Documents PDF
Abstract
En el presente trabajo de investigación se presentan los resultados y conclusiones obtenidas de una metodología gerencial combinada cualitativa y cuantitativa, aplicadas a una problemática técnica, identificada en la etapa de Construcción de un proyecto Hidroeléctrico. La problemática surge en la identificación de un déficit importante de material apto para construir los rellenos de las estructuras principales que funcionaran como contención del embalse de agua, el cual simultáneamente servirá para generar energía Eléctrica. La metodología se basa en tomar una serie de decisiones gerenciales necesarias para contrarestar el déficit de material apto para el relleno de las mencionadas estructuras.
This research report presents the results and conclusions obtained from a qualitative and quantitative analysis applied to a technical problem, which was identified throughout the construction process of a hydroelectric project. The problem arises with the detection of a significant shortage of suitable materials for the construction of water containment structures, which are designed to create an embankment of water used for electricity generation. The methodology applied consists of taking a series of management decisions needed to counteract the shortage of suitable materials for the completion of the aforementioned structures.
URI
http://hdl.handle.net/10654/13857
Collections
  • Alta Gerencia [721]

Browse

All of RI UMNGCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

View Usage Statistics
Estadísticas GTMVer Estadísticas GTM

Universidad Militar Nueva Granada

Institución Universitaria - Vigilada MinEducación - Decreto 1075 del 26 de mayo de 2015
Acreditación institucional de alta calidad de la educación superior, por seis años, mediante la resolución 10683 del 16 de julio de 2015
Linea de Atención: +57 (1) 650 0000
Información General: atencionalciudadano@unimilitar.edu.co
Notificaciones Judiciales:juridica@unimilitar.edu.co
NIT: 800.225.340 - 8
Dirección: Carrera 11 # 101 - 80 | Bogotá - Colombia
Sede Campus: Kilómetro 2 vía Cajicá - Zipaquirá
DSpace software copyright © 2002-2016  DuraSpace
Infotegra S.A.S
Contact Us | Send Feedback