Mostrar el registro sencillo del ítem
Diseño del Plan de Gestión de Riesgos para el mantenimiento y recuperación de las instalaciones del Centro Recreacional de Oficiales en la ciudad de Bogotá bajo lineamientos definidos en el PMBOK 5 ed.
dc.contributor.advisor | León Reyes, Freddy | spa |
dc.contributor.author | Rivera Calderón, Cindy Lorena | |
dc.coverage.spatial | Calle 100 | spa |
dc.date.accessioned | 2017-01-20T17:39:18Z | |
dc.date.accessioned | 2019-12-30T18:20:32Z | |
dc.date.available | 2017-01-20T17:39:18Z | |
dc.date.available | 2019-12-30T18:20:32Z | |
dc.date.issued | 2016-06-16 | |
dc.identifier.uri | http://hdl.handle.net/10654/14952 | |
dc.description.abstract | El presente artículo identifica la gestión de riesgos para la adecuación, reparación y mantenimiento del centro recreacional de oficiales de la Armada Nacional de Colombia en Bogotá D.C., mostrando los riesgos que en la actualidad se identifican en el complejo campestre, mediante la metodología de matriz de riesgos donde se evalúan los riesgos positivos y negativos, realizando un análisis cualitativo y cuantitativo de los mismos para mitigar los impactos de mayor representatividad del proyecto. Este estudio se realiza con el fin de identificar los riesgos que podrían afectar la seguridad y la integridad del personal de oficiales que disfrutaran de merecidos días de esparcimiento, descanso, ocio y convivencia con los demás oficiales y familiares que hacen parte de esta prestigiosa institución, por lo que se requiere realizar una adecuada evaluación de los riesgos que permita tomar decisiones acertadas para su manejo. Dado que los recursos que se invertirán son limitados, se hace imperativo identificar los sitios que requieren de una pronta intervención y evitar así un posible escenario de: retrasos en la programación de obra, generación de altos desperdicios de materiales, sobrecostos en recursos de mano de obra y tiempo, reprocesos que haría inviable la adecuada implementación del proyecto. La institución con el apoyo de la Dirección de Construcciones e Infraestructura y la Compañía de Ingenieros de Infantería de Marina, adelanta trabajos de adecuación, reparación y mantenimiento en las instalaciones del centro recreacional con miras a mejorar y fortalecer los sitios sociales donde se reunirá el personal militar con sus familias. | spa |
dc.format | spa | |
dc.language.iso | spa | spa |
dc.publisher | Universidad Militar Nueva Granada | spa |
dc.title | Diseño del Plan de Gestión de Riesgos para el mantenimiento y recuperación de las instalaciones del Centro Recreacional de Oficiales en la ciudad de Bogotá bajo lineamientos definidos en el PMBOK 5 ed. | spa |
dc.type | info:eu-repo/semantics/bachelorThesis | spa |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | spa |
dc.subject.lemb | ADMINISTRACION DE RIESGOS | spa |
dc.subject.lemb | EVALUACION DE RIESGOS | spa |
dc.subject.lemb | SALUD OCUPACIONAL | spa |
dc.publisher.department | Facultad de Ingeniería | spa |
dc.type.local | Trabajo de grado | spa |
dc.description.abstractenglish | This article identifies risk management to adapt, repair and construction of recreational center officers of the National Army of Colombia in Bogotá DC, showing the risks currently identified in the rural complex, using the methodology matrix risks where positive and negative risks are evaluated, making a qualitative and quantitative analysis of them to mitigate the impacts of greater representation of the project. This study was performed in order to generate the identification of risks that could affect the safety and integrity of staff officers who will enjoy deserved days of leisure, rest, leisure and coexistence with other officers and family members who are part of this prestigious institution, which is required to make a proper assessment of the risks to enable sound decision making for management. Since the resources invested are limited, it is imperative to identify sites that require early intervention to avoid a possible scenario: delays in scheduling work, generation of high waste of materials, cost overruns resources hand work and time, rework that would make it impossible proper implementation of the project. The institution with the support of the Department of Construction and Infrastructure and the Society of Engineers Marine, forward adaptation works, repair and construction facilities recreational center with a view to improving and strengthening social sites will bring together military personnel with their families. | eng |
dc.title.translated | Design of Risk Management Plan for maintenance and recovery of Recreational Facilities Center Officials in the city of Bogotá under the guidelines defined in the PMBOK 5 ed. | spa |
dc.subject.keywords | Methodology | spa |
dc.subject.keywords | risk management | spa |
dc.subject.keywords | risk analysis | spa |
dc.subject.keywords | matching structures | spa |
dc.subject.keywords | construction | spa |
dc.publisher.program | Especialización en Gerencia Integral de Proyectos | spa |
dc.creator.degreename | Especialista en Gerencia Integral de Proyectos | spa |
dc.relation.references | https://www.udistrital.edu.co/universidad/colombia/bogota/historia/ | spa |
dc.relation.references | http://camacol.co/sites/default/files/secciones_internas/Informe%20Econ%C3%B3mico%20-%20Dic2012-%20No%2044.pdf | spa |
dc.relation.references | http://clublamontana.com/visitante/index.php?option=com_content&task=view&id=4&Itemid=16 | spa |
dc.relation.references | Project Managment Institute, Inc. (2013). Guía de los fundamentos para la dirección de proyectos. Guía del PMBOK Quinta Edición. Pensilvania EE. UU. | spa |
dc.relation.references | Carolina Martinez Martinez. Gestión de riesgos en la construcción del edificio Akasha 106 en Bogotá. (Trabajo de Grado). (2015). Facultad de Ingeniería, Universidad Militar Nueva Granada. Bogotá. 18 p. | spa |
dc.relation.references | http://www.gerencie.com/para-que-sirve-la-matriz-dofa.html | spa |
dc.relation.references | http://www.pascualbravo.edu.co/pdf/calidad/gestionriesgos.pdf | spa |
dc.relation.references | http://www.eird.org/cd/toolkit08/material/proteccion-infraestructura/gestion_de_riesgo_de_amenaza/8_gestion_de_riesgo.pdf | spa |
dc.relation.references | http://www.academia.edu/5751394/TALUDES._T%C3%89CNICAS_PARA_LA_ESTABILIZACI%C3%93N_Y_PROTECCI%C3%93N_Y_SISTEMAS_CONTRA_DESPRENDIMIENTOS | spa |
dc.relation.references | http://www.fagro.edu.uy/hidrologia/riego/Drenaje.pdf | spa |
dc.subject.proposal | Metodología | spa |
dc.subject.proposal | Gestión de riesgos | spa |
dc.subject.proposal | análisis del riesgo | spa |
dc.subject.proposal | adecuación estructuras | spa |
dc.subject.proposal | construcción | spa |